North Sea Giant, one of the world’s largest and most advanced subsea construction vessels (OSV), has installed an innovative cost-saving solution to save fuel, emissions and maintenance costs. This system, based on The Switch’s unique Electronic Bus Link (EBL), enables the 18,151 GWT vessel to change between its diesel engines, running just one of its diesel engines during many operations, when necessary, rather than the standard three it used at all times in the past.
Photo source: North Sea Shipping