Normal before coronavirus was not working. Large cities had not seen a blue sky for decades. Now, we can finally see blue sky and clear water again. If we go back to the way things were, we will lose a valuable lesson that the last months have shown us – normal wasn’t working.
- All
- Blogs
- Events
- News
- Newsletters
- People stories
- References
Filter by topic:
- All
- Wind
- Marine
- Wave and Tidal
- Turbo
- CHP
- Energy storage
- Company
Filter by area:
Switching on frequently 01/2020: Keeping busy
The fight against the coronavirus is taking a lot of extra time from all of us. But we at The Switch are well positioned to get past these temporary difficulties. Our factories are keeping up 100% production capacity. And we continue delivering our products as promised.
Large Drive Test Center: Finalizing the floor
Large Drive Test Center is moving ahead. The latest step has been to complete the special heavy-duty floor. With its unique construction, the floor can hold the weight up to 80 tons, and will weigh approximately 1 million kg.
Changing the world, together
Asbjørn Halsebakke of Yaskawa Environmental Energy / The Switch shares his opinion about climate change with Malcolm Latarch of ShipInsight.