A Danish turbine manufacturer chose our medium-speed PMG for its 8 MW flagship. The first turbine prototypes has been installed at the start of 2014.

A Danish turbine manufacturer chose our medium-speed PMG for its 8 MW flagship. The first turbine prototypes has been installed at the start of 2014.
The Switch has supplied over 6,000 liquid-cooled FPCs for Goldwind’s 1.5 MW wind turbines.
The Switch has provided ScanWind with third-generation drive train packages that combine a 4.25 MW PMG and FPC for use in offshore wind turbine development efforts.
The Switch has provided Dongfang with a second-generation drive train package that combines a 1.5 MW direct-drive, outer rotor permanent magnet generator with a full-power converter.