3 MW FusionDrive® revealed at Husum WindEnergy 2012

On September 18, 2012 the actual, real-life sized 3 MW FusionDrive® was unveiled in front of a large audience at the joint The Switch and Moventas stand at Husum WindEnergy 2012.


Jukka-Pekka Mäkinen, President and CEO of The Switch, and Arto Lahtela, Senior Vice President, Sales of Moventas, explained why FusionDrive® is the smartest gear and generator combination in the market and were available for further discussions.

The Switch - FusionDrive press event at Husum WindEnergy 2012

Read more

Join us at China Wind Power 2012

When: November 15 – 17, 2012
Where: New China International Exhibition Center, Beijing, China

Visit us at booth #WD16 to learn more about how The Switch permanent magnet generators and full-power converters can lower the cost of energy!

The Switch - China Wind Power 2012

Read more

FusionDrive®, the industry’s smartest gear and generator combination revealed during Husum WindEnergy 2012

Moventas, one of the industry’s leading wind gear manufacturers, and The Switch, a leading supplier of megawatt-class permanent magnet generator and full-power converter packages, will today reveal a showpiece of the industry’s smartest wind gear and generator combination, FusionDrive®.

The real-life size, 3 MW FusionDrive® will be on show at the joint stand of Moventas and The Switch during the Husum WindEnergy 2012 event.

The Switch and Moventas - FusionDrive®

Read more