The Switch received orders for six permanent magnet (PM) shaft generators to be installed on newbuild methanol-powered containerships. The first PMM2000M will be delivered in Q2 2025. The new vessels will be ready for commissioning in 2026 and 2027. “This order for the world’s most advanced high-power permanent magnet shaft generators is part of the…
- All
- Blogs
- Events
- News
- Newsletters
- People stories
- References
Filter by topic:
- All
- Wind
- Marine
- Wave and Tidal
- Turbo
- CHP
- Energy storage
- Company
Filter by area:
How spare parts packages keep your equipment running smoothly
Imagine this: Your vessel is out at sea, and suddenly, you encounter a critical issue in your electricity distribution system. Wouldn’t it be reassuring to know that you have exactly what you need on hand to get back on course without delay? At The Switch, we’re committed to ensuring that long after our products have been…
Positive feedback from SMM
The Switch joined forces with BEMAC Corporation at this year’s SMM in Hamburg from September 3–6, 2024, to present the company’s extended range of solutions for the maritime industry. Asbjørn Halsebakke, Senior Manager, Marine Concepts at The Switch, presented the company’s power electronics product range, while Markus Silventoinen presented The Switch permanent magnet machines for…
Single drives extend lifetime of older vessels
The Switch single drives have been selected as part of a retrofit solution to hybridize a larger fleet of older vessels. The drives will connect batteries to the vessels’ AC switchboards. The Switch drives will be containerized with a battery and transformer by the system integrator and delivered as a single turnkey package. Delivery to…