In August, The Switch won an order for 12 PMM1500 permanent magnet (PM) shaft generators to be supplied for power take out (PTO) on newbuild liquefied natural gas carriers (LNGC). Deliveries are scheduled from Q3 2025 through Q3 2026. “Our permanent magnet technology was a perfect match for what the shipowner was looking for. Our…
- All
- Blogs
- Events
- News
- Newsletters
- People stories
- References
Filter by topic:
- All
- Wind
- Marine
- Wave and Tidal
- Turbo
- CHP
- Energy storage
- Company
Filter by area:
Preparing for future fuels and large batteries with DC-Hubs
Marine fuels for the future The marine community is still debating the correct fuel for the future. The biggest challenges are the availability of green energy and its storage. The regulations are there, the technology is there, but green energy availability and how to store it – both onshore and on vessels – is still…
Maritime Hybrid, Electric & Hydrogen Fuel Cells Conference, 2024
We are happy to announce our participation as a gold sponsor in the Maritime Hybrid, Electric & Hydrogen Fuel Cells Conference in Bergen, Norway during 29 October 2024 – 31 October 2024. Register for the event below, and come visit our experts at booth 9 or listen to our Thursday’s conference presentation. We are looking…
The Switch to deliver 2 PMM1500Ms for newbuild Pure Car, Truck Carriers
An order for two The Switch PMM1500M permanent magnet (PM) shaft generators was received for a newbuild Pure Car, Truck Carrier (PCTC) with the option for an additional two vessels. The vessels will use the shaft generators for power take out (PTO). The first PMM1500M is scheduled for delivery in Q1 2026 and the second…