Blue industrial PMM1000M shaft generator machine on the left with a blue ocean backdrop and the headline 'New orders for PMM1000M shaft generators' on the right.

New orders for PMM1000M shaft generators

On June 1, 2026, The Switch received a new order to deliver PMM1000M inline shaft generators for two newbuild hybrid 4,500 CEU pure car and truck carriers (PCTC). The Norwegian owner plans to operate these vessels in shallow water areas on short sea routes within Europe. Delivery of the first permanent magnet (PM) shaft generator…

Read more

New package order for 4 shaft generators and single drives

The Switch received a package order in February 2025 to supply its PMM1000M shaft generator and single-drive package to four newbuild 140-meter-long, 12,000 dwt multipurpose vessels (MPP), with an option for two additional vessels. The Switch PMM1000M’s slim design features a slightly smaller cooling unit, ensuring a better fit within the engine room. The vessels…

Read more

LDA equips three newbuild hybrid vessels with The Switch DC-Hub

France-based Louis Dreyfus Armateurs (LDA) has been selected by Airbus to build, own and operate an entire new fleet of low-emission vessels to transport its aircraft subassemblies between production facilities in Europe and the United States. The new fleet will cut average annual transatlantic CO2 emissions by 50%, achieving 33,000 tons in 2030 compared to…

Read more